From professional translators, enterprises, web pages and freely available translation repositories.
i have sent the correction slip to the editor
मैंने संशोधन पर्ची संपादक के पास भेज दी है ।
Last Update: 2020-05-24
Usage Frequency: 1
Quality:
schedule b ussor 10 (execution of works involved in the work covered by various chapters of sec railway, unified standard schedule of rates (works and material) 2010 of engineering department and indian railways unified standard specifications (works and materials) volume i and ii 2010 and up to date correction slip) 1640000.00 above / below / par 1 lump sum 1640000.00
schedule b ussor 10 (execution of works involved in the work covered by various chapter of sec railway ,unified standard schedule of rates (works and material)2010 of engineering department and indian railways unified standard specifications (works and materials) volume i and ii 2010 and up to date correction slip) 1640000.00 above/ below/par 1 lump sum 1640000.00
Last Update: 2020-07-08
Usage Frequency: 1
Quality:
Reference: