From professional translators, enterprises, web pages and freely available translation repositories.
remove whitespace when executing actions
ಕ್ರಿಯೆಗಳನ್ನು ಕಾರ್ಯಗತಗೊಳಿಸುವಾಗ ಖಾಲಿಜಾಗಗಳನ್ನು ತೆಗೆದು ಹಾಕು
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
strip whitespace when executing an action
ಕ್ರಿಯೆಗಳನ್ನು ಕಾರ್ಯಗತಗೊಳಿಸುವಾಗ ಖಾಲಿಜಾಗಗಳನ್ನು ತೆಗೆದು ಹಾಕು
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
error executing search command '%1 '.
ಆದೇಶ '% 1' ಅನ್ನು ಕಾರ್ಯಗತಗೊಳಿಸುವಾಗ ದೋಷ ಉಂಟಾಗಿದೆ.
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
error executing indexing build command: %1
ಸೂಚಿ ನಿರ್ಮಿಸುವ ಆದೇಶವನ್ನು ಕಾರ್ಯಗತಗೊಳಿಸುವಾಗ ದೋಷ:% 1
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
edit tab title format used when executing remote commands
ದೂರಸ್ಥ ಆದೇಶಗಳನ್ನು ಚಾಲಯಿಸುತ್ತಿರುವಾಗ ಉಪಯೋಗಿಸಬೇಕಾದ ಹಾಳೆ ಶೀರ್ಷಿಕೆ ನಮೂನೆಯನ್ನು ಸಂಪಾದಿಸು
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
executing shell commands works only on local directories.
ಶೆಲ್ ಆದೇಶಗಳನ್ನು ನಿರ್ವಹಿಸುವುದು ಕೇವಲ ಸ್ಥಳೀಯ ಕೋಶಗಳಿಗೆ ಮಾತ್ರ ಅನ್ವಯಿಸುತ್ತವೆ.
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
wait until we are told to show the window before executing the command
ಕಿಟಕಿಯನ್ನು ತೋರಿಸುವಂತೆ ಹೇಳುವವರೆಗೂ ಆದೇಶವನ್ನು ಕಾರ್ಯಗತಗೊಳಿಸಬೇಡ
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
goodmorning sirs, sorry, as i was out of station, probably mr. vinay somashekar, could not be possible to reach me. anyway, as i have been there in all your discussions, i would surely try to meet and have a final con call between you all, on this regard. but, going through the mail of mr. vinay ramesh, i am really shocked and sad, that, you have said you never agreed on executing the power reduction part on your own expenses. even though every paper has to be signed by the owner of the building, the process and expenditures to be taken care, was agreed by you. here my part is very much clear, that as a honest and prompt service provider, my soul intention is to clear the issues happening between you both, due to the difference in the meter reading happening on lt side and ht side, which, as agreed, i am trying to resolve within this month. but, overall, how muchever we try, whether go with whatever meter install by yourself, mr. vinay ramesh, it will not be 100% matching with the consumption recorded at lt side and ht side, which i hope, your professor, mr. nagaraj, also will vouch on this. so, as per the energy meter manufacturer instructions and guidance, i am working to resolve the matter to the nearest, which probably you both should take a call. so, let me know, when you want me at the site, accordingly i will to try schedule myself. goodmorning sirs, sorry, as i was out of station, probably mr. vinay somashekar, could not be possible to reach me. anyway, as i have been there in all your discussions, i would surely try to meet and have a final con call between you all, on this regard. but, going through the mail of mr. vinay ramesh, i am really shocked and sad, that, you have said you never agreed on executing the power reduction part on your own expenses. even though every paper has to be signed by the owner of the building, the process and expenditures to be taken care, was agreed by you. here my part is very much clear, that as a honest and prompt service provider, my soul intention is to clear the issues happening between you both, due to the difference in the meter reading happening on lt side and ht side, which, as agreed, i am trying to resolve within this month. but, overall, how muchever we try, whether go with whatever meter install by yourself, mr. vinay ramesh, it will not be 100% matching with the consumption recorded at lt side and ht side, which i hope, your professor, mr. nagaraj, also will vouch on this. so, as per the energy meter manufacturer instructions and guidance, i am working to resolve the matter to the nearest, which probably you both should take a call. so, let me know, when you want me at the site, accordingly i will to try schedule myself.
Last Update: 2020-05-27
Usage Frequency: 1
Quality:
Reference: