From professional translators, enterprises, web pages and freely available translation repositories.
existence of phase separation
fāžu atdalīšanas sekciju esamība
Last Update: 2014-11-21
Usage Frequency: 1
Quality:
the duration of phase 3,
posma ilgums;
Last Update: 2014-11-21
Usage Frequency: 1
Quality:
duration of phase in minutes
posma ilgums (minūtēs)
Last Update: 2014-11-21
Usage Frequency: 1
Quality:
arrangement of phase separation with long neutral section
fāzu sadalījuma izvietojums ar garu neitrālo sekciju
Last Update: 2014-11-21
Usage Frequency: 2
Quality:
two types of phase separation section are discussed.
aplūko divus fāzu sadalīšanas sekciju tipus.
Last Update: 2014-11-21
Usage Frequency: 2
Quality:
arrangement of phase separation with short neutral section
fāzu sadalījuma izvietojums ar īsu neitrālo sekciju
Last Update: 2014-11-21
Usage Frequency: 2
Quality:
installation of phase shifters and/or capacitor batteries in belgium
fāžu mainītāju un/vai kondensatoru bateriju uzstādīšana beļģijā
Last Update: 2014-11-21
Usage Frequency: 1
Quality:
on the wclm the existing type of phase separation sections will be retained.
uz wclm saglabā esošo fāzu sadalīšanas sekciju veidu.
Last Update: 2014-11-21
Usage Frequency: 2
Quality:
the directive foresees unlimited banking of phase 2 allowances into phase 3.
direktīvā paredzēta neierobežota iespēja uzkrāt otrā perioda kvotas un izmantot tās trešajā periodā.
Last Update: 2017-04-26
Usage Frequency: 1
Quality:
information on the realisation of phase 1 and phase 2 as indicated in recital 0,
informācija par pirmā un otrā etapa ieviešanu, kā norādīts 17. apsvērumā,
Last Update: 2014-11-21
Usage Frequency: 1
Quality:
two types of designs of phase separation sections may be adopted, either:
var izmantot divu veidu fāzu atdalīšanas sekcijas:
Last Update: 2014-11-13
Usage Frequency: 1
Quality:
at the start of phase 3, we see a surplus of almost two billion allowances.
mēs redzam, ka 3. posma sākumā ir izveidojies gandrīz divu miljardu liels kvotu pārpalikums.
Last Update: 2017-04-26
Usage Frequency: 1
Quality:
for future lines two types of designs of phase separation sections may be adopted:
turpmāk līnijām drīkst pieņemt divu veidu fāzu atdalīšanas sekciju plānojumus:
Last Update: 2014-11-21
Usage Frequency: 2
Quality:
the pw component is obtained by heat inactivation of phase i culture of bordetella pertussis bacteria.
pw komponents ir iegūts no 1. fāzes bordetella pertussis baktēriju kultūras, kas inaktivēta karsējot.
Last Update: 2017-04-26
Usage Frequency: 3
Quality:
such amendment shall not enter into force before the end of phase i as defined in article 8.
Šādi grozījumi nestājas spēkā pirms 8. pantā noteiktā i posma beigām.
Last Update: 2014-11-21
Usage Frequency: 1
Quality:
assessment of administrative challenges and potential to improve market functioning as of phase 4 needs to be further investigated
jāveic administratīvo problēmu novērtēšana, un jāizpēta potenciāls uzlabot tirgus darbību no 4. posma.
Last Update: 2017-04-06
Usage Frequency: 1
Quality:
of the 232 final decisions adopted at the end of phase i investigations, 220 were clearance decisions without undertakings.
no 232 galīgajiem lēmumiem, kas tika pieņemti pēc pirmā posma izmeklēšanas, 220 bija noformēšanas lēmumi, neiesaistot uzņēmumus.
Last Update: 2017-04-06
Usage Frequency: 1
Quality:
for design of phase separation sections, conformity assessment shall be carried out within assessment of the energy subsystem.
fāzu atdalīšanas sekciju konstrukcijas atbilstības novērtējumu veic elektroapgādes apakšsistēmas novērtējuma ietvaros.
Last Update: 2014-11-13
Usage Frequency: 1
Quality:
first delivery of phase iii variables on causes and circumstances: 2016 (data in respect of 2014).
iii posma mainīgie lielumi par iemesliem un apstākļiem pirmo reizi jāsniedz 2016. gadā (dati par 2014. gadu).
Last Update: 2014-11-21
Usage Frequency: 1
Quality:
rehabilitation of a set number of ammunition storage facilities (number to be determined at the end of phase 1).
atjaunināts konkrēts skaits munīcijas glabātavu (skaitu nosaka 1. posma beigās).
Last Update: 2014-11-09
Usage Frequency: 1
Quality: