From professional translators, enterprises, web pages and freely available translation repositories.
secondary schedule
programación secundaria
Last Update: 2007-01-16
Usage Frequency: 4
Quality:
create secondary schedule
crear programación secundaria
Last Update: 2007-01-16
Usage Frequency: 2
Quality:
secondary defragmentation job schedule
prog. secundaria
Last Update: 2007-01-16
Usage Frequency: 2
Quality:
secondary
secundario
Last Update: 2018-03-04
Usage Frequency: 1
Quality:
the secondary schedule is stopped.
la programación secundaria se detiene.
Last Update: 2007-01-16
Usage Frequency: 4
Quality:
primary schedule / secondary schedule
programación principal / programación secundaria
Last Update: 2007-01-16
Usage Frequency: 3
Quality:
/s - prints the secondary schedule.
/s - imprime la programación secundaria.
Last Update: 2007-01-16
Usage Frequency: 2
Quality:
secondary schedules
programaciones secundarias
Last Update: 2007-01-16
Usage Frequency: 2
Quality:
a “primary” and “secondary” schedule can be set for each.
se puede establecer una programación “principal” y otra “secundaria” para cada uno.
Last Update: 2007-09-18
Usage Frequency: 5
Quality:
primary and secondary schedules
programaciones principal y secundaria
Last Update: 2007-01-16
Usage Frequency: 2
Quality:
at this point, the secondary schedule’s job can start, so it does.
en este punto, ya puede iniciarse el trabajo de la programación secundaria, y así ocurre.
Last Update: 2007-01-16
Usage Frequency: 2
Quality:
primary schedule / secondary schedule interaction primary / secondary schedulescheduleprimary and secondary
interacción de la programación principal y la programación secundariaprincipal / secundariaprogramaciónprogramaciónprincipal y secundaria
Last Update: 2007-01-16
Usage Frequency: 2
Quality:
secondary schedule (select this option to set/clear the secondary schedule )
programación secundaria (seleccione esta opción para definir/borrar la programación secundaria)
Last Update: 2007-01-16
Usage Frequency: 2
Quality:
at that point (f), the primary schedule preempts the secondary schedule and starts its job.
en dicho punto (f), la programación principal impide que la programación secundaria se ejecute e inicia su trabajo.
Last Update: 2007-01-16
Usage Frequency: 4
Quality:
the secondary schedule runs from e to f, at which time the primary schedule is scheduled to start a job.
la programación secundaria se ejecuta entre e y f, momento en el cual la programación principal inicia el trabajo programado.
Last Update: 2007-01-16
Usage Frequency: 4
Quality:
secondary defragmentation jobs defragment the volumes you selected based on the schedule and other defragmentation properties you specify.
los trabajos de desfragmentación secundaria desfragmentan los volúmenes seleccionados en función de la programación y de otras propiedades de desfragmentación que haya especificado.
Last Update: 2007-01-16
Usage Frequency: 2
Quality:
diskeeper home edition does not support secondary schedules.
diskeeper home edition no es compatible con las programaciones secundarias.
Last Update: 2007-01-16
Usage Frequency: 1
Quality:
Warning: Contains invisible HTML formatting
the automatic generation option it generates now the secondary schedule in the 3d model and not only in material requisitions as before.
schedule diámetro secundario. en la opción de generación automática, el schedule del diámetro secundario para reducciones es ahora asignado directamente al componente durante su generación y no en la generación de las requisiciones como anteriormente.
Last Update: 2018-02-13
Usage Frequency: 1
Quality:
diskeeper supports secondary defragmentation schedules for each of your volumes.
diskeeper admite programaciones de desfragmentación secundarias para cada volumen.
Last Update: 2007-01-16
Usage Frequency: 2
Quality:
348. the schooling schedules (1994) are: primary secondary
348. en 1994 el calendario escolar es el siguiente:
Last Update: 2016-11-30
Usage Frequency: 1
Quality: