Results for rheinneckar translation from German to English

Computer translation

Trying to learn how to translate from the human translation examples.

German

English

Info

German

rheinneckar

English

 

From: Machine Translation
Suggest a better translation
Quality:

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

German

English

Info

German

2015 soll hier die s-bahn rheinneckar verkehren.

English

in 2015, the rheinneckar s-bahn will begin running here.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

im dezember 2003 ging die s-bahn rheinneckar in betrieb.

English

in december 2003, the rhine-neckar s-bahn commenced operations.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

2003 wurde er in das netz der s-bahn rheinneckar integriert.

English

2003 wurde er in das netz der s-bahn rheinneckar integriert.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

seit dezember 2003 ist der heidelberger hauptbahnhof ein knotenpunkt der s-bahn rheinneckar.

English

in december 2003, heidelberg station became a node on the rhine-neckar s-bahn.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

im märz 2007 wurde die patenschaft für einen zug der s-bahn rheinneckar übernommen.

English

in march 2007 it took on the sponsorship of a train on the rhine-neckar s-bahn.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

=== s-bahn rheinneckar ===auch für den regionalverkehr ist heidelberg hauptbahnhof bedeutend.

English

=== rhine-neckar s-bahn ===heidelberg hauptbahnhof is also significant for regional transportation.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

seit 2006 markiert der bahnhof außerdem den westlichen endpunkt der linie s1 der s-bahn rheinneckar.

English

it has been the western terminus of line s1 of the rhine-neckar s-bahn since 2006.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

== wirtschaft und infrastruktur ==am bahnhof weidenthal halten die züge der s-bahn rheinneckar.

English

== economy and infrastructure ===== transport ===stopping at weidenthal station are rheinneckar s-bahn trains on the saarbrücken–mannheim line.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

nach europaweiter ausschreibung wurde der betrieb der s-bahn rheinneckar für zwölf jahre bis 2015 an die db regio vergeben.

English

following european-wide advertising for tenders, operation for 12 years until 2015 was awarded to db regio.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

die s-bahn rheinneckar verbindet drei bundesländer und schweißt mannheim, ludwigshafen und heidelberg zur „metropolregion" zusammen.

English

the rapid transit railway rheinneckar connects three federal states and has fused mannheim, ludwigshafen and heidelberg into a metropolitan region.

Last Update: 2018-02-13
Usage Frequency: 1
Quality:

Warning: Contains invisible HTML formatting

German

die bahnsteige an der stadtbahnhaltestelle behielten ihre bisherige höhe von 38 cm, da sie nicht gegenstand des s-bahn rheinneckar-projektes waren.

English

the platforms at the stadtbahn stop were maintained at their original height of 55 cm, as it was not part of the rhine-neckar s-bahn project.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

=== künftige entwicklung ===die strecke mannheim–karlsruhe soll bis 2015 in das netz der s-bahn rheinneckar aufgenommen werden.

English

in 2015, the line is be included in the network of the rhine-neckar s-bahn.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

=== s-bahn rheinneckar ===die s-bahn rheinneckar bildet das rückgrat des schienenpersonennahverkehrs in der metropolregion rhein-neckar.

English

=== regional services====== rhine-neckar s-bahn ===the rhine-neckar s-bahn is the backbone of transport in the rhine-neckar region.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

außerdem stehen dort in bruchsal endende züge der s-bahn rheinneckar (s4) während ihrer halbstündlichen pause, welche teilweise auch auf gleis 5 ankommen.

English

regional-express trains to stuttgart stop at track 2b and rhine-neckar s-bahn s4 trains also stop there during their half hour lay over in bruchsal.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

=== verlängerung nach germersheim ===mit der verlängerung der linie mannheim–speyer bis nach germersheim wurde ende 2006 die erste ausbaustufe der s-bahn rheinneckar vollendet.

English

===extension to germersheim===the first stage was completed at the end of 2006 with the extension from homburg to kaiserslautern and the mannheim-speyer route to germersheim.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

== linien und betrieb ==das liniennetz der s-bahn rheinneckar ist mit rund 370 kilometern länge eines der größten s-bahn-netze deutschlands.

English

==network==the s-bahn is about 290 km long and is one of the largest s-bahn networks in germany.

Last Update: 2016-03-03
Usage Frequency: 2
Quality:

German

das beispiel der s-bahn rheinneckar (rheinland-pfalz) zeigt für den abschnitt schifferstadt - germersheim, wie sich auch auf hohem niveau in kurzer zeit neue fahrgäste (plus 48 prozent seit 2003) gewinnen lassen.

English

the line schifferstadt – germersheim on the s-bahn rheinneckar (rhineland palatinate) demonstrates how high-performing services can increase passenger numbers relatively quickly (48 percent since 2003).

Last Update: 2018-02-13
Usage Frequency: 1
Quality:

Get a better translation with
7,747,857,537 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK