From professional translators, enterprises, web pages and freely available translation repositories.
used defined
Last Update: 2021-05-23
Usage Frequency: 1
Quality:
Reference:
')' hilang selepas "defined"
missing ')' after "defined"
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
default: no shortcut defined
default:
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
Reference:
operator "defined" memerlukan pengenalpasti
operator "defined" requires an identifier
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
"defined" tidak boleh digunakan sebagai nama makro
"defined" cannot be used as a macro name
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
ini adalah penggunaan "defined" yang tidak boleh dialih
this use of "defined" may not be portable
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
the beautiful thing about life is that you can always change, grow and get better, you aren't defined by you past, you aren't you mistake
be with someone who is proud of you, someone you can laugh whith, someone who listens to you, understand you, who treats you well and makes you a priority
mental retardation (mr) is a generalized disorder appearing before adulthood, characterized by significantly impaired cognitive functioning and deficits in two or more adaptive behaviors. it has historically been defined as an intelligence quotient score under 70sembang chit
mental retardation (mr) is a generalized disorder appearing before adulthood, characterized by significantly impaired cognitive functioning and deficits in two or more adaptive behaviors. it has historically been defined as an intelligence quotient score under 70
Last Update: 2013-03-07
Usage Frequency: 1
Quality:
Reference:
variation in construction can be defined as- “any alteration or change in pre-existing conditions or requirements on the project. this alteration or modification include cost, time and method of performance.” variation to contractual conditions, design, or construction processes during the execution of the work result in the creation of variation orders. the variation order can be described as a written order between units and represents any additional work, omission or change that occurs during execution.
variation order (sometimes referred to as a variation instruction or request, change order or additional instruction) is a possible change in scope from what is documented in the project contract (tod bottari, 2014). the changes of the scope of work that from the original contract in order of addition, omission or substitution from the original scope of work that awarded. the variation may include: i. alteration to the design ii. alteration to the quantities iii. alteration to quality iv. al
Last Update: 2023-12-10
Usage Frequency: 1
Quality:
Reference: