검색어: project execution plan (영어 - 네덜란드어)

영어

번역기

project execution plan

번역기

네덜란드어

번역기
번역기

Lara로 텍스트, 문서 및 음성을 즉시 번역

지금 번역하기

인적 기여

전문 번역가, 번역 회사, 웹 페이지 및 자유롭게 사용할 수 있는 번역 저장소 등을 활용합니다.

번역 추가

영어

네덜란드어

정보

영어

execution plan

네덜란드어

werktekening

마지막 업데이트: 2014-11-14
사용 빈도: 5
품질:

추천인: IATE

영어

1. smooth project execution

네덜란드어

1. soepele uitvoering van het project

마지막 업데이트: 2018-02-13
사용 빈도: 1
품질:

추천인: IATE

영어

project execution stage: duties of coordinators

네덜란드어

verwezenlijking van het bouwwerk: taken van de cooerdinatoren

마지막 업데이트: 2014-10-23
사용 빈도: 1
품질:

추천인: IATE

영어

streamlining reporting procedures during project execution.

네덜란드어

de rapporteringsprocedures tijdens de uitvoering van het project worden gestroomlijnd.

마지막 업데이트: 2017-04-06
사용 빈도: 1
품질:

추천인: IATE

영어

at the project execution stage there are several scenarios.

네덜란드어

voor de projectuitvoeringsfase bestaan verschillende scenario's.

마지막 업데이트: 2017-04-06
사용 빈도: 1
품질:

추천인: IATE

영어

coordinator for safety and health matters at the project execution stage

네덜란드어

coördinator inzake veiligheid en gezondheid tijdens de verwezenlijking van het bouwwerk

마지막 업데이트: 2019-05-31
사용 빈도: 6
품질:

추천인: IATE

영어

in contrast to this, the project execution stage may now involve extra burdens.

네덜란드어

maar de fase van projectuitvoering kan nu met extra rompslomp gepaard gaan.

마지막 업데이트: 2017-04-06
사용 빈도: 2
품질:

추천인: IATE

영어

the focus remains on improving the quality of the management of the organisation and project execution.

네덜란드어

de focus blijft gericht op verbetering van de kwaliteit in de aansturing van de organisatie en de uitvoering van projecten.

마지막 업데이트: 2018-02-13
사용 빈도: 1
품질:

추천인: IATE

영어

it will be paid annually on the basis of the proposed execution plan.

네덜란드어

de bijdrage zal jaarlijks worden uitgekeerd op basis van het voorgestelde uitvoeringsplan.

마지막 업데이트: 2017-04-06
사용 빈도: 1
품질:

추천인: IATE

영어

further savings can be expected through the streamlined reporting procedures that will apply during project execution.

네덜란드어

er zijn verdere besparingen te verwachten door de toepassing van de gestroomlijnde rapportageprocedures tijdens de uitvoering van projecten.

마지막 업데이트: 2017-04-06
사용 빈도: 1
품질:

추천인: IATE

영어

quality assurance and control to improve the specification of project objectives as well as project execution and results;

네덜란드어

kwaliteitsborging en-controle ter verbetering van de specificatie van projectdoelstellingen alsmede van de uitvoering en de resultaten van projecten;

마지막 업데이트: 2014-11-15
사용 빈도: 2
품질:

추천인: IATE

영어

(a) quality assurance and control to improve the specification of project objectives as well as the project execution and results

네덜란드어

a) kwaliteitsborging en ‑controle ter verbetering van de specificatie van projectdoelstellingen alsmede van de uitvoering en de resultaten van projecten;

마지막 업데이트: 2017-04-06
사용 빈도: 1
품질:

추천인: IATE

영어

all the activities carried out in the context of an integrated project will be defined in the general framework of an "execution plan" comprising activities relating to:

네덜란드어

alle activiteiten in het kader van een geïntegreerd project worden omschreven in het algemene raamwerk van een "uitvoeringsplan", dat activiteiten omvat met betrekking tot:

마지막 업데이트: 2017-04-06
사용 빈도: 1
품질:

추천인: IATE
경고: 보이지 않는 HTML 형식이 포함되어 있습니다

영어

it will be paid annually on the basis of the proposed execution plan, and adjusted according to the activities and the financial reports.

네덜란드어

de bijdrage wordt jaarlijks betaald op basis van het voorgestelde uitvoeringsplan en wordt bijgesteld afhankelijk van de werkzaamheden en de financiële verslagen.

마지막 업데이트: 2017-04-06
사용 빈도: 1
품질:

추천인: IATE

영어

once a project is awarded clients can expect a thorough and structured way of project execution in which quality and result are of the foremost importance whilst keeping a certain degree of flexibility.

네덜란드어

opdrachtgevers mogen van adeas een gedegen en gestructureerde projectaanpak verwachten waarin de kwaliteit van het resultaat wordt gewaarborgd.

마지막 업데이트: 2018-02-13
사용 빈도: 1
품질:

추천인: IATE

영어

if the safety and health plan has not been drawn up or the coordinator has not been designated before the project execution stage, the obligation to incorporate prevention principles in project preparation has not been met.

네덜란드어

als vóór de uitvoeringsfase van het project geen veiligheids- en gezondheidsplan is opgesteld en geen coördinator is aangewezen, is niet voldaan aan de verplichting om bij de voorbereiding van het project met de preventiebeginselen rekening te houden.

마지막 업데이트: 2017-04-06
사용 빈도: 1
품질:

추천인: IATE

영어

the coordinator(s) for safety and health matters during the project execution stage appointed in accordance with article 3 (1) shall:

네덜란드어

een overeenkomstig artikel 3, lid 1, aangestelde cooerdinator inzake veiligheid en gezondheid tijdens de verwezenlijking van het bouwwerk:

마지막 업데이트: 2014-10-23
사용 빈도: 1
품질:

추천인: IATE

영어

the role of the coordinator under directive 92/57/eec is to coordinate the implementation of various health and safety provisions by those involved in project preparation and project execution stages.

네덜란드어

de coördinator moet volgens richtlijn 92/57/eeg de uitvoering van de verschillende gezondheids- en veiligheidsbepalingen door degenen die betrokken zijn bij de voorbereiding en de uitvoering van een project coördineren.

마지막 업데이트: 2017-04-06
사용 빈도: 1
품질:

추천인: IATE

영어

he will help drive the specific strategies and execution plans for online gaming expansion within the united states and other global jurisdictions.

네덜란드어

hij zal helpen rijden de specifieke strategieën en uitvoeringsplannen voor online gaming expansie binnen de verenigde staten en andere wereldwijde rechtsgebieden.

마지막 업데이트: 2018-02-13
사용 빈도: 1
품질:

추천인: IATE

영어

as a rule, project supervisors are familiar with coordinating safety and health matters during project execution but regret that safety is not taken sufficiently into account in the design and preparation, and feel that the responsibilities of the supervisor and the client ought to be more clearly defined.

네덜란드어

de bouwdirecties zijn in de regel vertrouwd met de coördinatie van de veiligheids- en gezondheidsaangelegenheden tijdens de uitvoering van een project, maar zij betreuren dat bij het ontwerp en de voorbereiding onvoldoende met de veiligheid rekening wordt gehouden en zij vinden dat de verantwoordelijkheden van de bouwdirectie en de opdrachtgever duidelijker moeten worden omschreven.

마지막 업데이트: 2017-04-06
사용 빈도: 1
품질:

추천인: IATE

인적 기여로
8,944,404,273 더 나은 번역을 얻을 수 있습니다

사용자가 도움을 필요로 합니다:



당사는 사용자 경험을 향상시키기 위해 쿠키를 사용합니다. 귀하께서 본 사이트를 계속 방문하시는 것은 당사의 쿠키 사용에 동의하시는 것으로 간주됩니다. 자세히 보기. 확인