Добавлены профессиональными переводчиками и компаниями и на основе веб-страниц и открытых баз переводов.
el más reciente es la doble maestría en ingeniería civil con la universidad de tongji, china (mayo 2008): el estudiante puede obtener un master in civil engineering y la laurea magistrale en ingegneria civil en trento.
the most recent one is the double degree in civil engineering with the university of tongi china (may 2008): students can achieve a master in civil engineering and the two year master course in civil engineering in trento.
Последнее обновление: 2016-03-03
Частота использования: 1
Качество:
this ultimately aims to demonstrate a market for eol-tyres in civil engineering and thus reduce the amount of collected eol-tyres being stockpiled or sent for uses with a higher carbon footprint.
use of such components will result in a substantial weight reduction by directly substituting heavier steel or cast iron components, which make up on average some 64% of the weight of a car.
Последнее обновление: 2017-04-26
Частота использования: 1
Качество:
astm international - sociedad estadounidense de ensayos y materiales: "standard practice for use of scrap tyres in civil engineering applications - designation d- 6270 - 98 " (aprobada nuevamente en 2004)
astm international - american society for testing materials: "standard practice for use of scrap tyres in civil engineering applications - designation d- 6270 - 98 " (reapproved, 2004)
Последнее обновление: 2016-11-30
Частота использования: 1
Качество:
Предупреждение: Содержит скрытое HTML-форматирование
Несколько пользовательских переводов с низким соответствием были скрыты.
Показать результаты с низким соответствием.