Results for what is earned value (ev) in civi... translation from Spanish to English

Spanish

Translate

what is earned value (ev) in civil engineering

Translate

English

Translate
Translate

Instantly translate texts, documents and voice with Lara

Translate now

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

Spanish

English

Info

Spanish

el más reciente es la doble maestría en ingeniería civil con la universidad de tongji, china (mayo 2008): el estudiante puede obtener un master in civil engineering y la laurea magistrale en ingegneria civil en trento.

English

the most recent one is the double degree in civil engineering with the university of tongi china (may 2008): students can achieve a master in civil engineering and the two year master course in civil engineering in trento.

Last Update: 2016-03-03
Usage Frequency: 1
Quality:

Spanish

this ultimately aims to demonstrate a market for eol-tyres in civil engineering and thus reduce the amount of collected eol-tyres being stockpiled or sent for uses with a higher carbon footprint.

English

use of such components will result in a substantial weight reduction by directly substituting heavier steel or cast iron components, which make up on average some 64% of the weight of a car.

Last Update: 2017-04-26
Usage Frequency: 1
Quality:

Spanish

astm international - sociedad estadounidense de ensayos y materiales: "standard practice for use of scrap tyres in civil engineering applications - designation d- 6270 - 98 " (aprobada nuevamente en 2004)

English

astm international - american society for testing materials: "standard practice for use of scrap tyres in civil engineering applications - designation d- 6270 - 98 " (reapproved, 2004)

Last Update: 2016-11-30
Usage Frequency: 1
Quality:

Warning: Contains invisible HTML formatting

Some human translations with low relevance have been hidden.
Show low-relevance results.

Get a better translation with
8,920,123,226 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK