您搜索了: rhj 096 (英语 - 阿拉伯语)

计算机翻译

尝试学会如何从人工翻译例句找到译文。

English

Arabic

信息

English

rhj 096

Arabic

 

从: 机器翻译
建议更好的译文
质量:

人工翻译

来自专业的译者、企业、网页和免费的翻译库。

添加一条翻译

英语

阿拉伯语

信息

英语

[gg 096]

阿拉伯语

[غ 096]

最后更新: 2017-08-29
使用频率: 1
质量:

参考: 匿名

英语

1965 096 a

阿拉伯语

1965 096 a

最后更新: 2016-12-02
使用频率: 1
质量:

参考: 匿名

英语

undt/2009/096

阿拉伯语

undt/2009/096

最后更新: 2016-12-01
使用频率: 2
质量:

参考: 匿名

英语

11 458 096 b

阿拉伯语

٠٩٦ ٤٥٨ ١١)ب(

最后更新: 2016-12-01
使用频率: 1
质量:

参考: 匿名

英语

tel 096 4612159 fax

阿拉伯语

tel 096 4612159 fax

最后更新: 2016-12-02
使用频率: 3
质量:

参考: 匿名

英语

fan performance data - 096

阿拉伯语

البيانات الفنية للمروحة - 096

最后更新: 2020-04-24
使用频率: 1
质量:

参考: Drkhateeb

英语

isbn 88-7205-096-0.

阿拉伯语

isbn 88-7205-096-0.

最后更新: 2016-03-03
使用频率: 1
质量:

参考: Drkhateeb

英语

096 7 miscellaneous equipment

阿拉伯语

معدات متنوعة

最后更新: 2016-12-01
使用频率: 1
质量:

参考: Drkhateeb

英语

` (#096;) grave accent

阿拉伯语

& # 096; خطيرمميتالقبر نبرة

最后更新: 2011-10-23
使用频率: 1
质量:

参考: Drkhateeb
警告:包含不可见的HTML格式

英语

096. environment and sustainable development

阿拉伯语

096-البيئة والتنمية المستدامة

最后更新: 2016-12-01
使用频率: 1
质量:

参考: Drkhateeb

英语

january 1998 10 096 500 9 722 700

阿拉伯语

كانون الثاني/يناير ١٩٩٨

最后更新: 2016-12-01
使用频率: 1
质量:

参考: Drkhateeb

英语

096 brunei darussalam brunei darsm brn

阿拉伯语

096 بروني دار السﻻم brunei darsm brn

最后更新: 2016-12-01
使用频率: 1
质量:

参考: Drkhateeb

英语

payable on medical insurance premium 299 096

阿拉伯语

اشتراكات صندوق المعاشات التقاعدية الواجبة الدفع

最后更新: 2016-12-01
使用频率: 1
质量:

参考: Drkhateeb

英语

a/o no. 2009-096 barret m82 a1

阿拉伯语

حساب مفتوح رقم 2009-096

最后更新: 2016-12-01
使用频率: 1
质量:

参考: Drkhateeb

英语

of these, 5 096 of the cases led to legal action.

阿拉伯语

ومن بين هذه القضايا اتخذت إجراءات قانونية في 096 5 قضية.

最后更新: 2016-12-02
使用频率: 3
质量:

参考: Drkhateeb

英语

(total budget $3,374,000) 3 096 700

阿拉伯语

)مجموع الميزانية ٠٠٠ ٣٧٤ ٣ دوﻻر( ٠٠,٧٠٠ ٠٩٦ ٣

最后更新: 2016-12-01
使用频率: 1
质量:

参考: Drkhateeb

英语

up to the end of march 2010, 1 096 young cssa recipients had participated in my step.

阿拉伯语

وإلى حد نهاية آذار/مارس 2010، شارك 096 1 شاباً من المستفيدين من خطة مساعدات الضمان الاجتماعي الشاملة في البرنامج.

最后更新: 2016-12-01
使用频率: 1
质量:

参考: Drkhateeb

英语

network connections (installations related to lan connectivity) 3 096 5 000 5 000

阿拉伯语

التوصيـﻻت الشبكية )تركيبـات التوصيـل بالشبكة المحلية(

最后更新: 2016-12-01
使用频率: 2
质量:

参考: Drkhateeb

英语

3 phase motors used for belt drive models (096~180) are tefc.

阿拉伯语

المحركات ثلاثية الطور المستخدمة في تشغيل الموديلات (096~180) بالسيور من فئة tefc.

最后更新: 2020-04-24
使用频率: 1
质量:

参考: Drkhateeb

英语

1. contractual and agreements: 1.1 main contract two contracts had been signed as shown here below for:  s1 / etwall / mep-002: o for an amount of 7,668,000 sar o 17 february 2019  s1 / etwall / mep-006: o for an amount of 10,500,000 sar o 20 august 2019 1.2 advance guarantee and performance bond: upon contracts’ signature, the below guarantees per agreements had been carried out:  advance guarantee for: o contract s1 / etwall / mep-002: 768,000 sar o contract s1 / etwall / mep-006: waved off on 30 september 2019 (attached)  performance guarantees per below information and that have been extended two times up till 31 december 2023: o ref no ert4193681:  amount: 525,000 sar  issue date :08-10-2019 o ref no ert4193104  amount: 383,400 sar  issue date: 16-04-2019 1.3 contract amendment the contracts s1 / etwall / mep-002 & s1 / etwall / mep-006 had then been amended as per below:  dated 08 august 2020  total amount: 23,500,000 sar 1.4 agreement upon amendment signature as per the amendment agreement, s1 shall apply no further and future deductions for previous inventory material and newly purchased materials from etwall balance invoicing. 2. variation orders and additional works during the construction phase evolution, additional works and reworks had been assigned to be carried out by etwall due to several reasons as attached within the variation orders’ summary for which works had been carried out with the consent and request of samsung s1 branch for which no feedback has been provided till date through the following sequence:  2,150,000 sar dated on 10 november 2021 (attached “re letter ref. tadawul-etwall-1121-085 - response to letter ref. tdw-s... (15.1 mb)”)  898,166.10 sar dated on 03 july 2022 following a meeting held on 14 june 2022 was agreed upon all parties for samsung s1 branch to have the variations related raised to the main client with no feedback (attached “s1 vo evaluation request --- s of meeting 14-06-2022 (23.4 kb)” & “tadawul tower - pending vo's - 2019 to 2022 (32.9 kb)”)  the submitted variations had been carried out based on site instructions that had been submitted by etwall for which samsung s1 branch had delayed providing back the signed copy by the main contractor “samsung jv”. o attached is a signed site instruction for reference for which etwall was able to receive a copy from the main client, samsung jv. attached are the letters related to:  the submitted vos: o attached “s1-vo's- financial updated report as per meeting 14-06-2022 (1)”  the supporting letters and work evidence and acknowledgement of the work done by samsung s1 branch o tadawul etwall0721-081 o tadawul etwall0721-082 o tadawul-etwall-0721-083 o tadawul-etwall-0721-084 o tadawul-etwall-0322-095 o tadawul-etwall-0422-096 o tadawul-etwall-0422-097 o tadawul-etwall-0322-098 o tadawul-etwall-0422-099 o tadawul-etwall-0522-100 o tadawul-etwall-0622-102 o tadawul-etwall-0622-103  the emails’ instructions and site reports submitted and that had been signed by the main contractor “fw_ tadawul - additional_rectification works vo-2_9_2021”: o fw vesda architecture diagram (240 kb) o fw(2) mtr odf cross connectivity (829 kb) o fwd fw fw re fw re re re re fw fw data hall -1 temperature an... (5.50 mb) o monitor modules to be installed as per latest (1.78 mb) 3 works completion and toc all along the site evolution, etwall has carried out the required scope of work under the contract agreement and provided standards with a complete receipt of the progress amount of works as per contract agreement following which etwall has requested samsung s1 branch for the toc however with feedbacks leading to a delay in receiving the toc noting that works remaining are snagging works that are to be considered out of the main execution scope of work for which a full progress had been settled. samsung s1 branch has received the toc from main contractor without issuing it back to etwall technology per contract clauses and agreement (back-to-back basis).  tadawul-etwall-2102-023-0120  tadawul project - request for toc letter 4 absence of constructive feedbacks. upon the receipt of the toc by samsung s1 branch, non-constructive feedbacks to our requests have taken place:  tadawul project was put on hold with the absence of the consultant due to the project handover to the main client  etwall has requested the toc for which feedback with snags has been provided noting that the systems concerned had been carried out and approved previously. 5 points of concern  approval of variation orders  issuance of toc  final and clear financial statement provision  payment plan

阿拉伯语

1. العقود والاتفاقيات: 1.1 العقد الرئيسي تم توقيع عقدين كما هو موضح أدناه من أجل:  s1 / etwall / mep 002: o بمبلغ 7,668,000 ريال سعودي o 17 فبراير 2019  s1 / etwall / mep 006: o بمبلغ 10,500,000 ريال سعودي o 20 أغسطس 2019 1.2 الضمان المسبق وضمان الأداء: عند توقيع العقد، تم تنفيذ الضمانات التالية لكل اتفاقية:  ضمان مسبق ل: o عقد s1 / etwall / mep 002: 768,000 ريال سعودي o عقد s1 / etwall

最后更新: 2023-04-26
使用频率: 1
质量:

参考: 匿名
警告:包含不可见的HTML格式

获取更好的翻译,从
7,739,062,776 条人工翻译中汲取

用户现在正在寻求帮助:



Cookie 讓我們提供服務。利用此服務即表示你同意我們使用Cookie。 更多資訊。 確認