From professional translators, enterprises, web pages and freely available translation repositories.
gm
unit description in lists
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
wb-gm
wb-gm
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
wb adjust gm
gm laras wb
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
on (shift gm)
on (shift gm)
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
gigameter; gigameters; gm
amount in units (real)
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
on june 27th will be held fire drill. gm told rdm and aehk to put a close notice on the guest.
pada 27 june akan diadakan fire drill. gm suruh rdm dan aehk untuk letak notis dekat pada guest.
Last Update: 2023-06-13
Usage Frequency: 1
Quality:
this is particularly important for blocking the area for gm's meeting on the 22 aug 2023 at 11am until 1pm.
ini amat penting bagi menyekat kawasan mesyuarat gm pada 22 ogos 2023 jam 11 pagi sehingga 1 tengah hari.
Last Update: 2023-08-16
Usage Frequency: 1
Quality:
our reference : tnb grid/gm/kl 14/13/1 date : mac 2018 ahmad fuad md arif general manager (business ventures) grid division rjo costing tripping incident on 26 february 2018 and repairing conductor snapped from 26 february 2018 till 28 february 2018. line involved: i. 132kv kampung lanjut – ampang menara t18 – t19 1.0 objective the objective of this memo is to create rjo costing to g-pile sistem sdn. bhd. who will bear the cost of tripping incident line 132kv kampung lanjut – ampang on 26 february 2018 and repairing work conductor snapped from 26 february 2018 till 28 february 2018. 2.0 background 3.0 0n 26 february 2018, 1319hours, 132kv kampung lanjut-ampang overhead line trip and autoreclose lockout. investigation has been done and tnb found conductor snapped between tower no. 18-19. conductor snapped caused by crane activity owned by g-pile sistem sdn. bhd. in rentice area. claim to bear the cost of the repairing work and normalizing line.. scope / description of work replacement snapped conductor and line normalise done for the lines mentioned above. 4.0 resource costing unit / department / : total margin : detail or workman: costing as is cost template in a1 & a2 5.0 duration period 5.1 3 days 5.2 from 26 february 2018 to 28 februari 2018 prepared by : reviewed by: _____________________________ ____________________________ _____________________________ ____________________________ _____________________________ ____________________________
rujukan kami: tnb grid / gm / kl 14/13/1
Last Update: 2018-04-03
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting