검색어: gm (영어 - 말레이어)

인적 기여

전문 번역가, 번역 회사, 웹 페이지 및 자유롭게 사용할 수 있는 번역 저장소 등을 활용합니다.

번역 추가

영어

말레이어

정보

영어

gm

말레이어

unit description in lists

마지막 업데이트: 2011-10-23
사용 빈도: 1
품질:

영어

wb-gm

말레이어

wb-gm

마지막 업데이트: 2014-08-15
사용 빈도: 1
품질:

영어

wb adjust gm

말레이어

gm laras wb

마지막 업데이트: 2014-08-15
사용 빈도: 1
품질:

영어

on (shift gm)

말레이어

on (shift gm)

마지막 업데이트: 2014-08-15
사용 빈도: 1
품질:

영어

gigameter; gigameters; gm

말레이어

amount in units (real)

마지막 업데이트: 2011-10-23
사용 빈도: 1
품질:

영어

on june 27th will be held fire drill. gm told rdm and aehk to put a close notice on the guest.

말레이어

pada 27 june akan diadakan fire drill. gm suruh rdm dan aehk untuk letak notis dekat pada guest.

마지막 업데이트: 2023-06-13
사용 빈도: 1
품질:

영어

this is particularly important for blocking the area for gm's meeting on the 22 aug 2023 at 11am until 1pm.

말레이어

ini amat penting bagi menyekat kawasan mesyuarat gm pada 22 ogos 2023 jam 11 pagi sehingga 1 tengah hari.

마지막 업데이트: 2023-08-16
사용 빈도: 1
품질:

영어

our reference : tnb grid/gm/kl 14/13/1 date : mac 2018 ahmad fuad md arif general manager (business ventures) grid division rjo costing tripping incident on 26 february 2018 and repairing conductor snapped from 26 february 2018 till 28 february 2018. line involved: i. 132kv kampung lanjut – ampang menara t18 – t19 1.0 objective the objective of this memo is to create rjo costing to g-pile sistem sdn. bhd. who will bear the cost of tripping incident line 132kv kampung lanjut – ampang on 26 february 2018 and repairing work conductor snapped from 26 february 2018 till 28 february 2018. 2.0 background 3.0 0n 26 february 2018, 1319hours, 132kv kampung lanjut-ampang overhead line trip and autoreclose lockout. investigation has been done and tnb found conductor snapped between tower no. 18-19. conductor snapped caused by crane activity owned by g-pile sistem sdn. bhd. in rentice area. claim to bear the cost of the repairing work and normalizing line.. scope / description of work replacement snapped conductor and line normalise done for the lines mentioned above. 4.0 resource costing unit / department / : total margin : detail or workman: costing as is cost template in a1 & a2 5.0 duration period 5.1 3 days 5.2 from 26 february 2018 to 28 februari 2018 prepared by : reviewed by: _____________________________ ____________________________ _____________________________ ____________________________ _____________________________ ____________________________

말레이어

rujukan kami: tnb grid / gm / kl 14/13/1

마지막 업데이트: 2018-04-03
사용 빈도: 1
품질:

추천인: 익명
경고: 보이지 않는 HTML 형식이 포함되어 있습니다

인적 기여로
7,735,174,734 더 나은 번역을 얻을 수 있습니다

사용자가 도움을 필요로 합니다:



당사는 사용자 경험을 향상시키기 위해 쿠키를 사용합니다. 귀하께서 본 사이트를 계속 방문하시는 것은 당사의 쿠키 사용에 동의하시는 것으로 간주됩니다. 자세히 보기. 확인