您搜索了: gm (英语 - 马来语)

人工翻译

来自专业的译者、企业、网页和免费的翻译库。

添加一条翻译

英语

马来语

信息

英语

gm

马来语

unit description in lists

最后更新: 2011-10-23
使用频率: 1
质量:

英语

wb-gm

马来语

wb-gm

最后更新: 2014-08-15
使用频率: 1
质量:

英语

wb adjust gm

马来语

gm laras wb

最后更新: 2014-08-15
使用频率: 1
质量:

英语

on (shift gm)

马来语

on (shift gm)

最后更新: 2014-08-15
使用频率: 1
质量:

英语

gigameter; gigameters; gm

马来语

amount in units (real)

最后更新: 2011-10-23
使用频率: 1
质量:

英语

on june 27th will be held fire drill. gm told rdm and aehk to put a close notice on the guest.

马来语

pada 27 june akan diadakan fire drill. gm suruh rdm dan aehk untuk letak notis dekat pada guest.

最后更新: 2023-06-13
使用频率: 1
质量:

英语

this is particularly important for blocking the area for gm's meeting on the 22 aug 2023 at 11am until 1pm.

马来语

ini amat penting bagi menyekat kawasan mesyuarat gm pada 22 ogos 2023 jam 11 pagi sehingga 1 tengah hari.

最后更新: 2023-08-16
使用频率: 1
质量:

英语

our reference : tnb grid/gm/kl 14/13/1 date : mac 2018 ahmad fuad md arif general manager (business ventures) grid division rjo costing tripping incident on 26 february 2018 and repairing conductor snapped from 26 february 2018 till 28 february 2018. line involved: i. 132kv kampung lanjut – ampang menara t18 – t19 1.0 objective the objective of this memo is to create rjo costing to g-pile sistem sdn. bhd. who will bear the cost of tripping incident line 132kv kampung lanjut – ampang on 26 february 2018 and repairing work conductor snapped from 26 february 2018 till 28 february 2018. 2.0 background 3.0 0n 26 february 2018, 1319hours, 132kv kampung lanjut-ampang overhead line trip and autoreclose lockout. investigation has been done and tnb found conductor snapped between tower no. 18-19. conductor snapped caused by crane activity owned by g-pile sistem sdn. bhd. in rentice area. claim to bear the cost of the repairing work and normalizing line.. scope / description of work replacement snapped conductor and line normalise done for the lines mentioned above. 4.0 resource costing unit / department / : total margin : detail or workman: costing as is cost template in a1 & a2 5.0 duration period 5.1 3 days 5.2 from 26 february 2018 to 28 februari 2018 prepared by : reviewed by: _____________________________ ____________________________ _____________________________ ____________________________ _____________________________ ____________________________

马来语

rujukan kami: tnb grid / gm / kl 14/13/1

最后更新: 2018-04-03
使用频率: 1
质量:

参考: 匿名
警告:包含不可见的HTML格式

获取更好的翻译,从
7,735,152,881 条人工翻译中汲取

用户现在正在寻求帮助:



Cookie 讓我們提供服務。利用此服務即表示你同意我們使用Cookie。 更多資訊。 確認