Results for collision bulkhead translation from English to Slovenian

English

Translate

collision bulkhead

Translate

Slovenian

Translate
Translate

Instantly translate texts, documents and voice with Lara

Translate now

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

English

Slovenian

Info

English

bulkhead

Slovenian

pregrada

Last Update: 2014-11-14
Usage Frequency: 5
Quality:

Reference: IATE

English

front bulkhead

Slovenian

prednja pregradna stena

Last Update: 2014-11-14
Usage Frequency: 5
Quality:

Reference: IATE

English

in the collision bulkhead below the margin line;

Slovenian

v prestrezni pregradi pod mejno ugrezno črto;

Last Update: 2017-04-06
Usage Frequency: 5
Quality:

Reference: IATE

English

bulkhead not gastight.

Slovenian

pregrade niso neprepustne za pline.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

English

they must not be installed forward of the collision bulkhead;

Slovenian

ne smejo biti nameščene pred pregrado proti trkom;

Last Update: 2014-11-21
Usage Frequency: 3
Quality:

Reference: IATE

English

there must be no accommodation forward of the collision bulkhead.

Slovenian

bivalni prostori se ne smejo raztezati dlje od pregrade proti trkom.

Last Update: 2014-11-21
Usage Frequency: 3
Quality:

Reference: IATE

English

if positioned forward they shall be positioned abaft the collision bulkhead, in a sheltered position.

Slovenian

Če so spredaj, morajo biti na zaščitenem mestu za pregrado proti trkom.

Last Update: 2017-04-06
Usage Frequency: 5
Quality:

Reference: IATE

English

a forepeak or collision bulkhead shall be fitted which shall be watertight up to the bulkhead deck.

Slovenian

ladja je opremljena s pregrado prednjega pretežnega tanka ali prestrezno pregrado, ki je nepropustna do pregradnega krova.

Last Update: 2017-04-06
Usage Frequency: 4
Quality:

Reference: IATE

English

.5 ramps not meeting the above requirements shall be disregarded as an extension to the collision bulkhead.

Slovenian

.2 se podaljšek lahko namesti v omejeni razdalji za zadnjo mejo, določeno v odstavku .1 ali odstavku .2, če obstoječa rampa ne izpolnjuje zahtev za priznavanje kot podaljšek k prestrezni pregradi in položaj rampe preprečuje namestitev takega podaljška znotraj meja, določenih v odstavku .1 ali odstavku .2. omejena zadnja razdalja ni večja, kakor je potrebno za zagotavljanje, da ne pride do trčenja z rampo. podaljšek prestrezne pregrade se odpira naprej in izpolnjuje zahteve iz odstavka .3 ter je postavljen tako, da izključuje možnost, da bi mu rampa povzročila škodo, če bi se rampa poškodovala ali snela. .5 rampe, ki ne izpolnjujejo zgoraj navedenih zahtev, se ne štejejo za podaljške prestreznih pregrad.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

English

the accommodation must be situated aft of the collision bulkhead and as much as possible of the accommodation must be above deck.

Slovenian

bivalni prostori morajo biti v smeri proti krmi glede na pregrado proti trkom, čim več pa jih mora biti nad palubo.

Last Update: 2014-11-21
Usage Frequency: 3
Quality:

Reference: IATE

English

where a long forward superstructure is fitted, the forepeak or collision bulkhead shall be extended weathertight to the next full deck above the bulkhead deck.

Slovenian

Če je ladja opremljena z dolgo sprednjo nadgradnjo, je pregrada prednjega pretežnega tanka ali prestrezna pregrada nepropustno podaljšana do naslednjega polnega krova nad pregradnim krovom.

Last Update: 2017-04-06
Usage Frequency: 4
Quality:

Reference: IATE

English

.2 bow visors fitted in positions, as indicated in paragraph .1.1; .3 cargo loading doors in the collision bulkhead;

Slovenian

.2 ščitniki na premcu, ki so nameščeni na položajih, kakor so navedeni v odstavku .1.1;

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

English

however the fitting of this valve on the afterside of the collision bulkhead may be accepted provided that the valve is readily accessible under all service conditions and the space in which it is located is not a cargo space.

Slovenian

sprejemljiva pa je tudi namestitev tega ventila na zadnji strani pregradnega krova, pod pogojem, da je ventil preprosto dostopen v vseh pogojih obratovanja in da prostor, v katerem je nameščen, ni prostor za tovor.

Last Update: 2017-04-06
Usage Frequency: 4
Quality:

Reference: IATE

English

when the fire-extinguishing medium is stored outside a protected space, it shall be stored in a room which is located behind the forward collision bulkhead and is used for no other purposes.

Slovenian

Če je gasilno sredstvo shranjeno zunaj zavarovanih prostorov, se shrani v prostoru, ki je za sprednjo prestrezno pregrado in se ne uporablja za nobene druge namene.

Last Update: 2017-04-06
Usage Frequency: 5
Quality:

Reference: IATE

English

the extension to the collision bulkhead shall open forward and comply with the requirements of paragraph .3 and shall be so arranged as to preclude the possibility of the ramp causing damage to it in the case of damage to, or detachment of, the ramp.

Slovenian

.1 del rampe, ki sega več kakor 2,3 metra nad pregradni krov, ne sega več kakor 1,0 meter čez sprednje meje, ki so določene v odstavku .1 in .2, če nagnjena nakladalna rampa tvori del podaljška prestrezne pregrade nad pregradnim krovom;

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

English

if the dimensions of the craft are modified, the transitional provisions no longer apply to those parts of the craft that are connected with this modification (e.g. distance of collision bulkhead, freeboard and anchor).

Slovenian

Če se spremenijo dimenzije plovnega objekta, se prehodne določbe prenehajo uporabljati za dele plovnega objekta, povezane s to spremembo (npr. razdalja do pregrade proti trkom, prostega boka in sidra).

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

English

water bulkheads extending to the deck or, in the absence of a deck, to the upper edge of the hull planking or plating must be installed as follows: (a) a collision bulkhead at an appropriate distance from the stem;

Slovenian

vodne pregrade, ki se raztezajo do krova, ali če plovilo nima krova do zgornjega roba lesene ali kovinske oplate trupa, morajo biti nameščene na naslednji način: (a) pregrada proti trkom mora biti na primerni razdalji od premca;

Last Update: 2014-11-21
Usage Frequency: 3
Quality:

Reference: IATE

English

.1 where a sloping loading ramp forms part of the extension of the collision bulkhead above the bulkhead deck, the part of the ramp which is more than 2,3 metres above the bulkhead deck may extend no more than 1,0 metre forward of the forward limits specified in paragraphs .1 and .2;

Slovenian

.4 za podaljšek, ki se zahteva v odstavku .3, ni potrebna namestitev neposredno nad pregrado pod njim, če vsi deli niso nameščeni pred sprednjo mejo, določeno v odstavku 1 ali odstavku 2.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

English

emergency sources of electrical power, fire pumps, bilge pumps except those specifically serving the spaces forward of the collision bulkhead, and fixed fire-extinguishing system required by chapter ii-2 and other emergency installations which are essential for the safety of the ship, except anchor windlasses, shall not be installed forward of the collision bulkhead.

Slovenian

zasilni viri električne energije, požarne črpalke, drenažne črpalke, razen tistih, ki so posebno izdelane za prostore pred prestrezno pregrado, vgrajeni sistem za gašenje požara, ki ga zahteva poglavje ii-2, ter druge zasilne naprave, ki so bistvene za varnost ladje, razen vitla za sidro, ne smejo biti nameščeni pred prestrezno pregrado.

Last Update: 2014-11-21
Usage Frequency: 3
Quality:

Reference: IATE

Get a better translation with
9,141,468,644 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK