From professional translators, enterprises, web pages and freely available translation repositories.
sand blasting
raspalama
Last Update: 2017-02-14
Usage Frequency: 1
Quality:
fire - blasting
yangin-patlama
Last Update: 2017-09-13
Usage Frequency: 1
Quality:
(g) blasting
(g) kumlama
Last Update: 2017-01-21
Usage Frequency: 1
Quality:
abrasive blasting
aşındırıcı püskürtme
Last Update: 2017-06-09
Usage Frequency: 1
Quality:
blasting (kg/ton)
patlatma (kg/ton)
Last Update: 2019-02-11
Usage Frequency: 1
Quality:
painting and blasting
boyama ve kumlama
Last Update: 2017-01-21
Usage Frequency: 1
Quality:
the effect of blasting
patlatmanin etkİsİ
Last Update: 2019-02-11
Usage Frequency: 1
Quality:
annual number of blasting
yıllık patlatma sayısı
Last Update: 2019-02-11
Usage Frequency: 1
Quality:
- drilling and blasting works
-sondaj ve patlatma işleri
Last Update: 2017-06-13
Usage Frequency: 1
Quality:
when will the blasting be conducted
kaç günde bir patlatma yapılacağı
Last Update: 2019-02-11
Usage Frequency: 1
Quality:
we saw laborers blasting rocks.
kayaları patlatan işçiler gördük.
Last Update: 2014-02-01
Usage Frequency: 1
Quality:
physical conditions of blasting area and
patlatma alanının fiziksel koşulları ve
Last Update: 2019-02-11
Usage Frequency: 1
Quality:
9 blasting order and placing of capsules
9 patlatma düzeni ve kapsüllerin yerleştirilmesi
Last Update: 2019-02-11
Usage Frequency: 2
Quality:
10 anfo blasting effect according to diesel amount
10 anfo’nun mazot miktarına göre patlama etkisi
Last Update: 2019-02-11
Usage Frequency: 2
Quality:
* blasting shall be conducted 4 times a week.
*patlatmalar haftada 4 gün yapılacaktır.
Last Update: 2019-02-11
Usage Frequency: 1
Quality:
the blasting processes shall be conducted by the experts.
patlatmalar, konusunda uzman kişilerce gerçekleştirilecektir.
Last Update: 2019-02-11
Usage Frequency: 1
Quality:
these parameters can be changed and affect the blasting performance.
bu parametreler değiştirilerek patlatma performansına etki edebilir.
Last Update: 2019-02-11
Usage Frequency: 1
Quality:
there are many parameters affecting the efficiency of the bench blasting.
basamak patlatma verimini etkileyen birçok parametre vardır.
Last Update: 2019-02-11
Usage Frequency: 1
Quality:
within the scope of the project, the bench blasting is performed.
proje kapsamında basamak patlatması gerçekleştirilecektir.
Last Update: 2019-02-11
Usage Frequency: 1
Quality:
other options include chiselling or underwater blasting to loosen intact rock.
diğer seçenekler ise bütün kayayı gevşetmek için taraklama veya su altı patlama yöntemlerini içermektedir.
Last Update: 2017-01-20
Usage Frequency: 1
Quality: