From professional translators, enterprises, web pages and freely available translation repositories.
naik taraf
upgrade
Last Update: 2014-04-06
Usage Frequency: 1
Quality:
Reference:
10mb naik taraf
10mb upgrade
Last Update: 2011-10-23
Usage Frequency: 36
Quality:
Reference:
naik taraf androind
upgraded androind
Last Update: 2017-10-10
Usage Frequency: 2
Quality:
Reference:
selamat hari naik taraf
meningkat usia
Last Update: 2023-07-20
Usage Frequency: 1
Quality:
Reference:
naik taraf menambah bilangan lorong bagi sultan ibrahim
reserve specification
Last Update: 2022-04-10
Usage Frequency: 1
Quality:
Reference:
anda telah dilog keluar kerana naik taraf mandatori diperlukan.
you have been logged out as a mandatory update is required.
Last Update: 2010-07-07
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
tapak tidak tersedia disebabkan oleh beberapa operasi naik taraf... kami akan kembali secepat mungkin!
site is unavailable due to some upgrade operations... we will be back soon!
Last Update: 2011-06-05
Usage Frequency: 1
Quality:
Reference:
versi gnupg anda lebih lama daripada 1. 2. 0. id foto dan kumpulan kunci tidak akan berfungsi dengan baik. pertimbangkan naik taraf gnupg (http: // gnupg. org)
your gnupg version seems to be older than 1.2.0 (%1). photo id's and key groups will not work properly. please consider upgrading gnupg (http: / /gnupg. org).
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
Reference:
objektif rasionalisasi pembetungan adalah untuk mengalihkan beban kumbahan dari klr 134 ke klr 261 dengan: a) menaik taraf klr 134 dari lagun berudara sedia ada dengan kapasiti 11,747 pe ke stesen pam rangkaian dengan kapasiti 27,935 pe b) membina paip forcemain baru pada panjang 1,839 km c) membina paip aliran graviti baru pada panjang 1,279 km d) penyahtauliahan dan menaik taraf paip aliran graviti baru pada panjang 1,279 km d) penyahtauliahan dan naik taraf klr 329 (2,000 pe) di taman alam damai ke stesen pam rangkaian dengan kapasiti
the objective of the sewerage rationalization is to ultimately divert the sewage load from klr 134 to klr 261 by: a) upgrading klr 134 from an existing aerated lagoon with a capacity of 11,747 pe to a network pumping station with a capacity of 27,935 pe b) constructing a new forcemain pipe at a length of 1,839 km c) constructing a new gravity flow pipe at a length of 1,279 km d) decommissioning and upgrading klr 329 (2,000 pe) at taman alam damai to a network pumping station with a capacity of
Last Update: 2024-07-04
Usage Frequency: 1
Quality:
Reference: