来自专业的译者、企业、网页和免费的翻译库。
teams and conditions
ટીમો અને શરતો
最后更新: 2023-05-31
使用频率: 1
质量:
we have pleasure in appointing you as principal in our organization on the following terms and conditions:
નીચેના નિયમો અને શરતો પર અમારી સંસ્થામાં તમને પ્રિન્સિપલ તરીકે નિમણૂક કરવામાં અમને આનંદ છે:
最后更新: 2018-05-17
使用频率: 1
质量:
参考:
with reference to the trailing mail, kindly note in the said equipment we need to replace the bottom disc with some area of shell, also note offer price as per your last po no 67450. kindly arrange to release the po along with same terms and condition.
ટ્રેઇલિંગ મેઇલના સંદર્ભમાં, કૃપા કરીને ઉપરોક્ત સાધનોમાં નોંધ લો કે અમારે બોટમ ડિસ્કને શેલના કેટલાક વિસ્તાર સાથે બદલવાની જરૂર છે, તમારા છેલ્લા પીઓ નંબર 67450 મુજબ ઓફરની કિંમત પણ નોંધો. કૃપા કરીને સમાન નિયમો અને શરતો સાથે પી.ઓ.ને મુક્ત કરવાની ગોઠવણ કરો.
最后更新: 2024-01-31
使用频率: 1
质量:
参考:
for all these reasons, risk evaluation is tricky at baseline, and reporting on risk can be misleading, especially when it shares some numbers in absolute terms and others in relative terms.
આ બધાં કારણોને લીધે, જોખમની ગણતરી એક અટપટી આધારરેખા ધરાવે છે અને તેનું રિપોર્ટિંગ ગેરમાર્ગે દોરી શકે જયારે તે આંકડાને નિરપેક્ષ રીતે અને બીજા સાપેક્ષ પદોમાં દર્શાવે.
最后更新: 2020-12-03
使用频率: 1
质量:
参考:
but in the long term, and maybe even in the short term, i think these arguments can be counterproductive.
પરંતુ લાંબા ગાળે, અને કદાચ ટૂંકા ગાળામાં પણ, મને લાગે છે કે આ દલીલો પ્રતિકારક હોઈ શકે છે.
最后更新: 2020-12-03
使用频率: 1
质量:
参考:
date: july 30, 2007 to, mr. bharatkumar pravinbhai nai at. surajpura, ta. palanpur, dist. banaskantha. dear mr. bharatkumar p. nai with reference to your application and subsequent interview you had with us, we are pleased to appoint you as “sr. engineer design” at our organization with effect from july 30, 2007, as per the terms and condition appended herewith. you will be on probation for a period of six months. if your performance is found satisfactory, you will be confirmed in your post. during your probation period, your emoluments per month will be as follows: basic salary rs. 5000.00 h.r.a. rs. 750.00 c.c.a. rs. 1560.00 gross salary rs. 7310.00 after confirmation, you will be absorbed in company’s regular cadre and you will be entitled to all benefits applicable as per company’s rules and regulations. kindly return the duplicate copy of this order duly signed, in confirmation of your acceptance. yours truly, for, rajedia pumps pvt. ltd., the above terms & conditions are acceptable to me vijay h. patil bharatkumar p. nai [vice president – operation]
date: july 30, 2007 to, mr. bharatkumar pravinbhai nai at. surajpura, ta. palanpur, dist. banaskantha. dear mr. bharatkumar p. nai with reference to your application and subsequent interview you had with us, we are pleased to appoint you as “sr. engineer design” at our organization with effect from july 30, 2007, as per the terms and condition appended herewith. you will be on probation for a period of six months. if your performance is found satisfactory, you will be confirmed in your post. during your probation period, your emoluments per month will be as follows: basic salary rs. 5000.00 h.r.a. rs. 750.00 c.c.a. rs. 1560.00 gross salary rs. 7310.00 after confirmation, you will be absorbed in company’s regular cadre and you will be entitled to all benefits applicable as per company’s rules and regulations. kindly return the duplicate copy of this order duly signed, in confirmation of your acceptance. yours truly, for, rajedia pumps pvt. ltd., the above terms & conditions are acceptable to me vijay h. patil bharatkumar p. nai [vice president – operation]
最后更新: 2018-11-23
使用频率: 1
质量:
参考:
警告:包含不可见的HTML格式
一些相关性较低的人工翻译已被隐藏。
显示低相关性结果。