Results for midtskibs translation from Danish to English

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

Danish

English

Info

Danish

midtskibs

English

midships

Last Update: 2014-11-14
Usage Frequency: 8
Quality:

Reference: IATE

Danish

kahyt midtskibs

English

centre cabin

Last Update: 2014-11-14
Usage Frequency: 5
Quality:

Reference: IATE

Danish

± 35 % lbp fra midtskibs

English

± 35 % lbp from midship;

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

Danish

pullert midtskibs på sidedæk

English

gangway bollard amidships

Last Update: 2014-11-14
Usage Frequency: 5
Quality:

Reference: IATE

Danish

skære et skib igennem midtskibs

English

to cut though amidships

Last Update: 2014-11-14
Usage Frequency: 5
Quality:

Reference: IATE

Danish

inddeleingslastelinje tildelt og påmærket på skibssiden midtskibs

English

subdivision load lines assigned and marked on the ship’s side at amidships

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

Danish

den er klar af fiskerfartøjets indfaldende sider og så vidt mulig kan anvendes midtskibs

English

it is clear of the finer lines and as far as practicable in the middle length of the fishing vessel;

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

Danish

følerdelen skal så vidt muligt monteres midtskibs, vandret og i fartøjets længdeakse.

English

the sensor system shall be installed as far as possible amidships, horizontal and aligned with the ship’s fore-and aft-line.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

Danish

dybgang er den lodrette afstand fra kølens overkant midtskibs til den pågældende inddelingslastelinje.

English

draught is the vertical distance from the moulded base line amidships to the subdivision load line in question.

Last Update: 2017-04-06
Usage Frequency: 5
Quality:

Reference: IATE

Danish

den værste skade midtskibs med hensyn til restfribord i midtskibsområdet, hvis dette er krævet i henhold til punkt 2.1.

English

the worst midship damage case with regard to the residual freeboard in the midship area if required by 2.1.

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE

Danish

beregninger af lækstabilitet i værste solas-tilfælde og værste skade midtskibs (hvis de er forskellige)

English

damage stability calculations for worst solas and mid-ship damage (if different);

Last Update: 2017-04-06
Usage Frequency: 2
Quality:

Reference: IATE

Danish

tildeling og afmærkning af inddelingslastelinjer på skibssiden: midtskibs (regel ii-1/b/11)

English

subdivision load lines assigned and marked on the ship’s side at: amidships (regulation ii-1/b/11

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

Danish

.1 for at sikre opretholdelse af den påbudte inddelingsgrad skal der tildeles en lastelinje svarende til den godkendte inddelingsdybgang, og denne linje skal påmærkes skibets sider midtskibs.

English

.1 in order that the required degree of subdivision shall be maintained, a load line corresponding to the approved subdivision draught shall be assigned and marked on the ship’s sides amidships.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: IATE

Danish

et yderligere forsøg kræves på ret køl ved en midtskibsskade, hvis det værste skadesområde i henhold til solas 90 er uden for afstanden ± 10% lpp fra midtskibs.

English

an additional test is required at a level keel midship damage, if the worst damage location according to solas 90 is outside the range ± 10% lpp from the midship.

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE

Danish

3.skibe, hvis længde er 76 m eller derover, skal midtskibs have dobbeltbund, der strækker sig til for- og agterpeakskotterne eller så nær til disse som praktisk muligt..

English

3 in ships of 76 metres in length and upwards, a double bottom shall be fitted admidships and shall extend to the fore and after peak bulkhead or as near as practicable..

Last Update: 2017-01-05
Usage Frequency: 3
Quality:

Reference: Translated.com

Danish

.3 skibe, hvis længde er 76 meter eller derover, skal midtskibs have dobbeltbund, der strækker sig til for- og agterpeakskotterne eller så nær til disse som praktisk muligt.

English

.3 in ships of 76 metres in length and upwards, a double bottom shall be fitted amidships and shall extend to the fore and after peak bulkhead or as near as practicable.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: Translated.com

Danish

der skal udføres et supplerende forsøg for værst tænkelige tilfælde inden for ± 10 % lbp fra midtskibs, hvis skadetilfældet i punkt 1 ligger uden for ± 10 % lbp fra midtskibs.

English

an additional test will be required for the worst damage within ± 10 % lbp from midship if the damage case referred to in .1 is outside of ± 10 % lbp from midship.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: Translated.com

Get a better translation with
7,746,977,352 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK