Results for scheduling and routing translation from English to Persian

English

Translate

scheduling and routing

Translate

Persian

Translate
Translate

Instantly translate texts, documents and voice with Lara

Translate now

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

English

Persian

Info

English

youre so on all the time , with all the scheduling and planning , its just .

Persian

و تو هميشه در حال برنامه ريزي و نقشه کشيدن هستي ، و اين فقط .

Last Update: 2011-10-24
Usage Frequency: 1
Quality:

English

==network addressing and routing==computers participating in a network such as the internet each have at least one logical address.

Persian

رایانه‌هایی که در یک شبکه همانند اینترنت حضور دارند هر یک حداقل دارای یک آدرس منطقی هستند.

Last Update: 2016-03-03
Usage Frequency: 1
Quality:

English

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

Persian

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

Last Update: 2021-03-05
Usage Frequency: 1
Quality:

Reference: Anonymous

Some human translations with low relevance have been hidden.
Show low-relevance results.

Get a better translation with
8,761,516,124 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK