Je was op zoek naar: scheduling and routing (Engels - Perzisch)

Engels

Vertalen

scheduling and routing

Vertalen

Perzisch

Vertalen
Vertalen

Vertaal onmiddellijk teksten, documenten en gesprekken met Lara

Nu vertalen

Menselijke bijdragen

Van professionele vertalers, bedrijven, webpagina's en gratis beschikbare vertaalbronnen.

Voeg een vertaling toe

Engels

Perzisch

Info

Engels

youre so on all the time , with all the scheduling and planning , its just .

Perzisch

و تو هميشه در حال برنامه ريزي و نقشه کشيدن هستي ، و اين فقط .

Laatste Update: 2011-10-24
Gebruiksfrequentie: 1
Kwaliteit:

Engels

==network addressing and routing==computers participating in a network such as the internet each have at least one logical address.

Perzisch

رایانه‌هایی که در یک شبکه همانند اینترنت حضور دارند هر یک حداقل دارای یک آدرس منطقی هستند.

Laatste Update: 2016-03-03
Gebruiksfrequentie: 1
Kwaliteit:

Engels

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

Perzisch

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

Laatste Update: 2021-03-05
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Enkele menselijke vertalingen met lage relevantie werden verborgen.
Toon lage-relevantie resultaten.

Krijg een betere vertaling met
8,763,666,877 menselijke bijdragen

Gebruikers vragen nu voor assistentie



Wij gebruiken cookies om u de best mogelijke ervaring op onze website te bieden. Door de website verder te gebruiken, geeft u toestemming voor het gebruik van cookies. Klik hier voor meer informatie. OK