Vous avez cherché: scheduling and routing (Anglais - Perse)

Anglais

Traduction

scheduling and routing

Traduction

Perse

Traduction
Traduction

Traduisez instantanément des textes, des documents et des voix avec Lara

Traduire maintenant

Contributions humaines

Réalisées par des traducteurs professionnels, des entreprises, des pages web ou traductions disponibles gratuitement.

Ajouter une traduction

Anglais

Perse

Infos

Anglais

youre so on all the time , with all the scheduling and planning , its just .

Perse

و تو هميشه در حال برنامه ريزي و نقشه کشيدن هستي ، و اين فقط .

Dernière mise à jour : 2011-10-24
Fréquence d'utilisation : 1
Qualité :

Anglais

==network addressing and routing==computers participating in a network such as the internet each have at least one logical address.

Perse

رایانه‌هایی که در یک شبکه همانند اینترنت حضور دارند هر یک حداقل دارای یک آدرس منطقی هستند.

Dernière mise à jour : 2016-03-03
Fréquence d'utilisation : 1
Qualité :

Anglais

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

Perse

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

Dernière mise à jour : 2021-03-05
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Certaines traductions humaines peu pertinentes ont été masquées.
Affichez les résultats peu pertinents.

Obtenez une traduction de meilleure qualité grâce aux
8,760,164,667 contributions humaines

Les utilisateurs demandent maintenant de l'aide :



Nous utilisons des cookies pour améliorer votre expérience utilisateur sur notre site. En poursuivant votre navigation, vous déclarez accepter leur utilisation. En savoir plus. OK