Você procurou por: scheduling and routing (Inglês - Persa)

Inglês

Tradutor

scheduling and routing

Tradutor

Persa

Tradutor
Tradutor

Traduza instantaneamente textos, documentos e voz com a Lara

Traduzir agora

Contribuições humanas

A partir de tradutores profissionais, empresas, páginas da web e repositórios de traduções disponíveis gratuitamente

Adicionar uma tradução

Inglês

Persa

Informações

Inglês

youre so on all the time , with all the scheduling and planning , its just .

Persa

و تو هميشه در حال برنامه ريزي و نقشه کشيدن هستي ، و اين فقط .

Última atualização: 2011-10-24
Frequência de uso: 1
Qualidade:

Inglês

==network addressing and routing==computers participating in a network such as the internet each have at least one logical address.

Persa

رایانه‌هایی که در یک شبکه همانند اینترنت حضور دارند هر یک حداقل دارای یک آدرس منطقی هستند.

Última atualização: 2016-03-03
Frequência de uso: 1
Qualidade:

Inglês

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

Persa

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

Última atualização: 2021-03-05
Frequência de uso: 1
Qualidade:

Referência: Anônimo

Algumas traduções humanas com pouca relevância foram ocultadas.
Mostrar resultados de pouca relevância.

Consiga uma tradução melhor através
8,764,579,725 de colaborações humanas

Usuários estão solicitando auxílio neste momento:



Utilizamos cookies para aprimorar sua experiência. Se avançar no acesso a este site, você estará concordando com o uso dos nossos cookies. Saiba mais. OK