You searched for: scheduling and routing (Engelska - Persiska)

Engelska

Översätt

scheduling and routing

Översätt

Persiska

Översätt
Översätt

Översätt texter, dokument och röst direkt med Lara

Översätt nu

Mänskliga bidrag

Från professionella översättare, företag, webbsidor och fritt tillgängliga översättningsdatabaser.

Lägg till en översättning

Engelska

Persiska

Info

Engelska

youre so on all the time , with all the scheduling and planning , its just .

Persiska

و تو هميشه در حال برنامه ريزي و نقشه کشيدن هستي ، و اين فقط .

Senast uppdaterad: 2011-10-24
Användningsfrekvens: 1
Kvalitet:

Engelska

==network addressing and routing==computers participating in a network such as the internet each have at least one logical address.

Persiska

رایانه‌هایی که در یک شبکه همانند اینترنت حضور دارند هر یک حداقل دارای یک آدرس منطقی هستند.

Senast uppdaterad: 2016-03-03
Användningsfrekvens: 1
Kvalitet:

Engelska

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

Persiska

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

Senast uppdaterad: 2021-03-05
Användningsfrekvens: 1
Kvalitet:

Referens: Anonym

Vissa mänskliga översättningar med låg relevans har dolts.
Visa resultat med låg relevans.

Få en bättre översättning med
8,762,299,574 mänskliga bidrag

Användare ber nu om hjälp:



Vi använder cookies för att förbättra din upplevelse. Genom att fortsätta besöka den här webbplatsen godkänner du vår användning av cookies. Läs mer. OK