검색어: scheduling and routing (영어 - 페르시아어)

영어

번역기

scheduling and routing

번역기

페르시아어

번역기
번역기

Lara로 텍스트, 문서 및 음성을 즉시 번역

지금 번역하기

인적 기여

전문 번역가, 번역 회사, 웹 페이지 및 자유롭게 사용할 수 있는 번역 저장소 등을 활용합니다.

번역 추가

영어

페르시아어

정보

영어

youre so on all the time , with all the scheduling and planning , its just .

페르시아어

و تو هميشه در حال برنامه ريزي و نقشه کشيدن هستي ، و اين فقط .

마지막 업데이트: 2011-10-24
사용 빈도: 1
품질:

영어

==network addressing and routing==computers participating in a network such as the internet each have at least one logical address.

페르시아어

رایانه‌هایی که در یک شبکه همانند اینترنت حضور دارند هر یک حداقل دارای یک آدرس منطقی هستند.

마지막 업데이트: 2016-03-03
사용 빈도: 1
품질:

영어

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

페르시아어

project planning and control are critical functions in project management. these functions involve a host of decision problems for scheduling projects, identifying and reporting the status of the project, comparing it with the baseline plan, analyzing the deviations, detecting out-of-control situations, and taking appropriate corrective actions (hazir 2015). to address these decision problems, a wide variety of methods, techniques, and tools have been developed during the last decades. among these methods, mathematical models and algorithms have been used to investigate various project planning problems and literature review papers can be found in herroelen (2005), herroelen and leus (2005), kolisch and padman (2001), tavares (2002), w˛eglarz et al. (2011), and zhou et al. (2013). these reviews cover studies that address a wide range of project planning problems, mostly related to project scheduling and resource allocation.

마지막 업데이트: 2021-03-05
사용 빈도: 1
품질:

추천인: 익명

연관성이 낮은 일부 인적 번역은 숨겨져 있습니다.
연관성이 낮은 결과 표시.

인적 기여로
8,913,952,582 더 나은 번역을 얻을 수 있습니다

사용자가 도움을 필요로 합니다:



당사는 사용자 경험을 향상시키기 위해 쿠키를 사용합니다. 귀하께서 본 사이트를 계속 방문하시는 것은 당사의 쿠키 사용에 동의하시는 것으로 간주됩니다. 자세히 보기. 확인